Frame overhang, truss grips and loads on the wrong wall

Bottom plates hanging off the slab, trusses without tie-down grips and roof load sitting on a non-loadbearing wall, from a Maddingley frame inspection.

Ballarat 3350 · 31 March 2026

In short: Frame stage is when the structure is fully visible. The items below are simple to fix now and very hard to reach once the house is lined.

Plates off the edge

Bottom plates should not overhang the slab by more than 10mm. On a Maddingley frame inspection in December 2025 several runs were beyond that, reducing how much of the plate bears on concrete.

Slab past the frame

The reverse also came up: slab protruding more than 20mm past the frame, which squeezes the cavity between the frame and the brickwork.

Truss tie-down

Trusses need grips or other fixings holding them to the wall plate. Several were missing. Tie-down resists wind uplift, and that matters on open, exposed blocks.

Load on the wrong wall

Some trusses were bearing on internal walls not designed to carry roof load. That puts weight where the frame was not built to take it.

Slab level

The same inspection found the slab out of level beyond the tolerance allowed in the Guide to Standards and Tolerances 2015, a problem that affects every trade that follows.

What a frame report gives you

Each item is measured, photographed and referenced to AS 1684, the NCC, the truss layout or the engineering. The builder fixes before lock-up, and the next stage inspection checks they were done.

Written by our local inspection team from work carried out in Ballarat. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.

Guides

More new construction stage inspections guides for Ballarat

All guides →

Book a building inspection in Ballarat

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Ballarat owners ask about this

Does the building surveyor not check the frame?

The surveyor carries out a mandatory frame inspection, but it is not an itemised report for you.

Can overhang be fixed?

Usually, with packing, trimming or additional support as the builder or engineer specifies.

Do you inspect the trusses' design?

We check support, fixing and bracing against the layout. The truss design is the supplier's.

When should I book?

Once the frame and trusses are up and before wrap, windows or cladding cover the frame.

CallGet a Free Quote