Lock-up inspection for a Ballarat build

Lock-up means the shell is closed: roof on, windows and external doors fitted, cladding up. Inside, the frame, insulation and services are still in plain sight, and that is what we inspect before plaster covers them.

  • Roof, windows and cladding up, plasterboard not yet delivered
  • 1 to 2 hours on site
  • Report within 24 hours
Ask for a Ballarat quoteLeave your details and a regional inspector calls you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage4 of 7
When to bookRoof, windows and cladding up, plasterboard not yet delivered
Time on site1 to 2 hours on site
Inspected againstAS 3700 (masonry), AS 4773, AS 2047 (windows), NCC Part 3.5 roof and wall cladding, manufacturer flashing details

What is included in a Ballarat lock-up (pre-plaster) inspection

  • Earlier frame items rechecked
  • Bracing intact after services went in
  • Wall wrap lapped and complete
  • Wrap on the garage to house wall
  • Sarking under the roof covering
  • Wall and ceiling insulation fitted
  • Insulation in the garage to house wall
  • Windows and outside doors installed
  • Noggings around baths and fittings
  • Walls plumbed and straightened
  • Gas and hot water separation
  • Pipes clipped and capped
  • Temporary downpipes connected
Why it matters here

Lock-up (pre-plaster) inspections on Ballarat builds

A Ballarat winter is long and cold, so wall and ceiling insulation and the wrap between garage and house earn their place every season. Gaps left now cannot be fixed without pulling sheets off later. Frosty mornings and damp air also make a well lapped wall wrap and roof sarking worth checking closely.

What we find at this stage in Ballarat

  • Frame defects from the last stage still open
  • Bracing cut through to fit services
  • Garage to house wall left unwrapped
  • Insulation not yet in walls and ceilings
  • Gas line touching the hot water pipe
  • Tiled roof going on without sarking beneath
Wall and ceiling insulation still to go in before plaster, found during a lock-up inspection in Maddingley
Wall and ceiling insulation still to go in before plaster, Maddingley
Noggings missing around the bath hob to carry the plaster edge, found during a lock-up inspection in Maddingley
Noggings missing around the bath hob to carry the plaster edge, Maddingley
No temporary downpipes, so roof water pours against the slab, found during a lock-up inspection in Maddingley
No temporary downpipes, so roof water pours against the slab, Maddingley
Sample findings

Sample defects found during our lock-up (pre-plaster) inspections in Ballarat

Annotated findings from Lock-up (pre-plaster) inspections.

Wall bracing cut through, weakening the frame against wind load, found during a lock-up inspection in Maddingley
Wall bracing cut through, weakening the frame against wind load, Maddingley
Wall wrap missing between the garage and the house, found during a lock-up inspection in Maddingley
Wall wrap missing between the garage and the house, Maddingley
Gas pipe touching the hot water line, inside the 100mm separation, found during a lock-up inspection in Maddingley
Gas pipe touching the hot water line, inside the 100mm separation, Maddingley
No sarking under the tiled roof, with the builder to confirm it, found during a lock-up inspection in Maddingley
No sarking under the tiled roof, with the builder to confirm it, Maddingley
Earlier frame defect rechecked at lock-up and still not fixed, found during a lock-up inspection in Maddingley
Earlier frame defect rechecked at lock-up and still not fixed, Maddingley

The other stages of a Ballarat build

  1. Bored piers inspection in Ballarat1Bored piersAfter drilling and cage placement, while every hole is still open
  2. Slab pre-pour inspection in Ballarat2Slab pre-pourSteel, pods and pipes done, formwork braced, pour not yet started
  3. Frame inspection in Ballarat3FrameWalls standing and trusses braced, before wrap or sarking closes it in
  4. Fixing inspection in Ballarat5FixingLinings, doors, trims and cabinets fitted, painter yet to start
  5. Waterproofing inspection in Ballarat6WaterproofingMembrane on and cured, no tiles yet
  6. Pre-handover (PCI) inspection in Ballarat7Pre-handover (PCI)Builder has notified completion and the final claim is pending

All construction stage inspections in Ballarat →

Guides

Construction stage guides for Ballarat

All guides →

Book a lock-up (pre-plaster) inspection in Ballarat

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Lock-up (pre-plaster) inspections in Ballarat: common questions

Why recheck frame items at lock-up?

Because once plaster goes up they disappear. We list which earlier items have been fixed and which are still open, so nothing slips through.

Is insulation checked at lock-up?

We note whether wall and ceiling batts are installed, fitted without gaps and present between the garage and the house. Missing insulation in a cold climate shows up on every energy bill.

What is wrong with cutting bracing?

Bracing resists wind and racking loads. A cut brace no longer does its job, so the builder must replace or repair it to the bracing design.

Do you inspect the plumbing at this stage?

Visually. We look at clearances such as gas to hot water separation and whether pipes are clipped and capped. Testing is for the licensed plumber.

Does lock-up include windows and doors?

Yes. We look at how frames are fixed and flashed and whether all external openings are actually closed in, as the contract stage requires.

Is lock-up a contract payment stage?

Often, yes. That is why the report is useful before you pay the lock-up claim: you can show the builder exactly what is incomplete.