Ballarat Building
Inspections

Roof sheets, downpipes and stormwater at handover

Debris on a new roof, sheets overhanging the gutter, loose downpipes and a broken stormwater pipe: the drainage items a pre-handover inspection catches.

Ballarat 3350 · 8 April 2026

In short: A new roof can look perfect and still be set up to fail: swarf and debris left on the sheets, overhangs that throw water past the gutter and downpipes not fixed to the wall.

Debris left behind

Offcuts, screws and grit left on a metal roof hold moisture and can mark or corrode the coating. We note it so the builder clears it before handover.

Overhang into the gutter

Roof sheets are meant to finish within a set distance over the gutter. On one Bacchus Marsh handover the sheets overhung by more than 65mm, enough for heavy rain to shoot over the gutter.

Fixings and washers

Roof screws that are overdriven or have damaged rubber washers can leak. We check what is visible and report the ones that are not sitting right.

Downpipes and drains

Downpipes not secured to the wall, air conditioner drains running onto the ground and a broken stormwater pipe were all recorded on the same type of inspection. Water that is not taken away ends up against the slab.

Why this matters on Ballarat ground

Ballarat's wettest months are in winter, when evaporation is low. Water dumped at the edge of a new slab has nowhere quick to go, and wet ground at the footing is how movement and damp problems start.

After the report

The builder fixes the list, and a reinspection confirms it. Keep the report: it is useful again if an item reappears during the warranty period.

Written by our local inspection team from work carried out in Ballarat. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.

Guides

More pci / handover guides for Ballarat

You have the handover report. What now?

7 July 2026 · 5 min read

You have the handover report. What now?

How to send a pre-handover report to your builder, agree a fix list, book a reinspection and keep the paper trail if items are not resolved.

All guides →

Book a building inspection in Ballarat

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Ballarat owners ask about this

Will the inspector climb onto the new roof?

Where it is safe. Otherwise we inspect from a ladder, a pole camera or a drone.

Do you camera inspect stormwater?

No. Where we suspect a blockage or break, we recommend a plumber's camera inspection.

Is debris on the roof really a defect?

It is a completion item the builder should clear, and it can damage the coating if left.

Can I hold the final payment until these are fixed?

Your contract sets the terms. Many owners negotiate completion of listed items before paying.

CallGet a Free Quote